Method of optimization design and practical engineering checking of composite pile foundation 復(fù)合樁基優(yōu)化設(shè)計(jì)方法與工程驗(yàn)證
The network engineer checks the switch configuration using the analyzer and confirms that some ports have been shut down 使用分析儀檢查了交換機(jī)構(gòu)造后,工程師認(rèn)定有些端口已經(jīng)被關(guān)閉了。
Some problems common appeared in engineering checking and accepting are discussed and the author appeals that attention shall be paid to guarantee the normal operation of automatic sprinkling fire system 以檢查與驗(yàn)收中發(fā)現(xiàn)的一些問題為例,呼吁有關(guān)各方共同關(guān)注工程質(zhì)量,以確保系統(tǒng)的滅火效能得以有效發(fā)揮。